Date |
Code |
Page |
Course
Title |
Days |
Cost
in SR |
Venue |
| Jan 3 |
M11A |
M1 |
AC&R
Troubleshooting |
5 Days |
7,000 |
Dammam |
| Jul 4 |
M11A |
M1 |
AC&R
Troubleshooting |
5 Days |
8,000 |
Riyadh |
| Nov 14 |
M11A |
M1 |
AC&R
Troubleshooting |
5 Days |
7,000 |
Dammam |
| Feb 14 |
M86A |
M1 |
Air
Conditioning Machine Operation |
5 Days |
7,000 |
Dammam |
| Jun 6 |
M86A |
M1 |
Air
Conditioning Machine Operation |
5 Days |
8,000 |
Jubail |
| Nov 14 |
M86A |
M1 |
Air
Conditioning Machine Operation |
5 Days |
7,000 |
Dammam |
| Apr 4 |
M87AE |
M2 |
Air
Conditioning Systems: Design and Application |
5 Days |
7,000 |
Dammam |
| Aug 8 |
M87AE |
M2 |
Air
Conditioning Systems: Design
and Application |
5 Days |
8,000 |
Abha |
| Dec 19 |
M87AE |
M2 |
Air
Conditioning Systems: Design
and Application |
5 Days |
7,000 |
Dammam |
| Feb 7 |
M48AE |
M2 |
Advanced
Alignment |
5 Days |
7,000 |
Dammam |
| Aug 2 |
M48AE |
M2 |
Advanced
Alignment |
5 Days |
9,000 |
Dammam |
| Dec 5 |
M48AE |
M2 |
Advanced
Alignment |
5 Days |
7,000 |
Dammam |
| Mar 7 |
M71AE |
M3 |
Advanced
Pump Technology |
5 Days |
7,000 |
Dammam |
| Sept 27 |
M71AE |
M3 |
Advanced
Pump Technology |
5 Days |
9,000 |
Cairo |
| Dec 12 |
M71AE |
M3 |
Advanced
Pump Technology |
5 Days |
7,000 |
Dammam |
| Mar 14 |
M39A |
M3 |
An
Introduction to Machine Alignment |
5 Days |
7,000 |
Dammam |
| Jul 11 |
M39A |
M3 |
An
Introduction to Machine Alignment |
5 Days |
7,000 |
Dammam |
| Nov 21 |
M39A |
M3 |
An
Introduction to Machine Alignment |
5 Days |
7,000 |
Dammam |
| Jan 17 |
M62A |
M4 |
Applications
of
Hydraulic Control Circuits |
5 Days |
7,000 |
Dammam |
| May 9 |
M62A |
M4 |
Applications
of
Hydraulic Control Circuits |
5 Days |
8,000 |
Abha |
| Oct 10 |
M62A |
M4 |
Applications
of
Hydraulic Control Circuits |
5 Days |
7,000 |
Dammam |
| Jan 11 |
M59A |
M4 |
Advanced
Turbine Control and Protection |
5 Days |
9,000 |
Oman |
| May 2 |
M59A |
M4 |
Advanced
Turbine Control and Protection |
5 Days |
7,000 |
Dammam |
| Oct 3 |
M59A |
M4 |
Advanced
Turbine Control and Protection |
5 Days |
7,000 |
Dammam |
| Apr 11 |
M72A |
M5 |
Automation
Maintenance of
Diesel Fuel |
5 Days |
7,000 |
Dammam |
| Jul 18 |
M72A |
M5 |
Automation
Maintenance of
Diesel Fuel |
5 Days |
7,000 |
Dammam |
| Nov 28 |
M72A |
M5 |
Automation
Maintenance of
Diesel Fuel |
5 Days |
8,000 |
Jubail |
| Feb 28 |
M7A |
M5 |
Bearings
and
Lubrication |
5 Days |
7,000 |
Dammam |
| Aug 15 |
M7A |
M5 |
Bearings
and
Lubrication |
5 Days |
8,000 |
Riyadh |
| Dec 5 |
M7A |
M5 |
Bearings
and
Lubrication |
5 Days |
7,000 |
Dammam |
| Jan 24 |
M63A |
M6 |
Bearing
Selection, Maintenance and
Failure Analysis |
5 Days |
7,000 |
Dammam |
| Jul 18 |
M63A |
M6 |
Bearing
Selection, Maintenance and
Failure Analysis |
5 Days |
7,000 |
Dammam |
| Nov 15 |
M63A |
M6 |
Bearing
Selection, Maintenance and
Failure Analysis |
5 Days |
9,000 |
Abu Dhabi |
| Feb 21 |
M57A |
M6 |
Bearing
Selection
and Troubleshooting |
5 Days |
7,000 |
Dammam |
| Jun 13 |
M57A |
M6 |
Bearing
Selection
and Troubleshooting |
5 Days |
7,000 |
Dammam |
| Dec 26 |
M57A |
M6 |
Bearing
Selection
and Troubleshooting |
5 Days |
8,000 |
Abha |
| Mar 21 |
M66AE |
M7 |
Boiler
Design, Operation and Maintenance |
5 Days |
7,000 |
Dammam |
| Jul 25 |
M66AE |
M7 |
Boiler
Design,
Operation and Maintenance |
5 Days |
8,000 |
Dammam |
| Nov 21 |
M66AE |
M7 |
Boiler
Design,
Operation and Maintenance |
5 Days |
7,000 |
Jubail |
| Jan 3 |
M31A |
M7 |
Boiler
Efficiency |
5 Days |
7,000 |
Dammam |
| Jun 20 |
M31A |
M7 |
Boiler
Efficiency |
5 Days |
8,000 |
Riyadh |
| Oct 17 |
M31A |
M7 |
Boiler
Efficiency |
5 Days |
7,000 |
Dammam |
| Jan 10 |
M9A |
M8 |
Boiler
Operation
and Maintenance |
5 Days |
7,000 |
Dammam |
| May 16 |
M9A |
M8 |
Boiler
Operation
and Maintenance |
5 Days |
7,000 |
Dammam |
| Sept 26 |
M9A |
M8 |
Boiler
Operation
and Maintenance |
5 Days |
8,000 |
Abha |
| Mar 28 |
M98A |
M8 |
Centrifugal
Gas Compressor |
5 Days |
7,000 |
Dammam |
| Aug 1 |
M98A |
M8 |
Centrifugal
Gas Compressor |
5 Days |
8,000 |
Jubail |
| Dec 12 |
M98A |
M8 |
Centrifugal
Gas Compressor |
5 Days |
7,000 |
Dammam |
| Apr 25 |
M73A |
M9 |
Cooling
Water Treatment Systems |
5 Days |
7,000 |
Dammam |
| Jul 11 |
M73A |
M9 |
Cooling
Water Treatment Systems |
5 Days |
7,000 |
Dammam |
| Oct 31 |
M73A |
M9 |
Cooling
Water Treatment Systems |
5 Days |
8,000 |
Dammam |
| Feb 14 |
M29A |
M9 |
Corrosion
in
Power
Plant |
5 Days |
7,000 |
Dammam |
| Jul 11 |
M29A |
M9 |
Corrosion
in
Power
Plant |
5 Days |
8,000 |
Jubail |
| Nov 14 |
M29A |
M9 |
Corrosion
in
Power
Plant |
5 Days |
7,000 |
Dammam |
| Jan 17 |
M12A |
M10 |
Compressors,
Blowers and Turbochargers |
5 Days |
8,000 |
Riyadh |
| May 23 |
M12A |
M10 |
Compressors,
Blowers and Turbochargers |
5 Days |
7,000 |
Dammam |
| Sept 26 |
M12A |
M10 |
Compressors,
Blowers and Turbochargers |
5 Days |
7,000 |
Dammam |
| Jan 24 |
M49A |
M10 |
Condition
Based Monitoring and Maintenance |
5 Days |
7,000 |
Dammam |
| Jun 6 |
M49A |
M10 |
Condition
Based Monitoring and Maintenance |
5 Days |
7,000 |
Dammam |
| Dec 20 |
M49A |
M10 |
Condition
Based Monitoring and Maintenance |
5 Days |
9,000 |
Qatar |
| Apr 18 |
M79A |
M11 |
CNC
Machine Tools |
5 Days |
10,000 |
Dammam |
| Jul 4 |
M79A |
M11 |
CNC
Machine Tools |
5 Days |
10,000 |
Dammam |
| Oct 24 |
M79A |
M11 |
CNC
Machine Tools |
5 Days |
10,000 |
Dammam |
| Feb 7 |
M97A |
M11 |
Combined
Cycle
Plants |
5 Days |
7,000 |
Dammam |
| Jun 27 |
M97A |
M11 |
Combined
Cycle
Plants |
5 Days |
9,000 |
Abha |
| Nov 28 |
M97A |
M11 |
Combined
Cycle
Plants |
5 Days |
7,000 |
Dammam |
| Jan24 |
M23A |
M12 |
Cutting
Tools |
5 Days |
7,000 |
Dammam |
| May 30 |
M23A |
M12 |
Cutting
Tools |
5 Days |
8,000 |
Jubail |
| Oct 3 |
M23A |
M12 |
Cutting
Tools |
5 Days |
7,000 |
Dammam |
| Apr 4 |
M41A |
M12 |
Desalination
Technology |
5 Days |
7,000 |
Dammam |
| Sept 26 |
M41A |
M12 |
Desalination
Technology |
5 Days |
8,000 |
Riyadh |
| Dec 26 |
M41A |
M12 |
Desalination
Technology |
5 Days |
7,000 |
Dammam |
| Feb 7 |
M101A |
M13 |
Destructive
Tests |
5 Days |
7,000 |
Dammam |
| Jun 13 |
M101A |
M13 |
Destructive
Tests |
5 Days |
8,000 |
Jubail |
| Oct 10 |
M101A |
M13 |
Destructive
Tests |
5 Days |
7,000 |
Dammam |
| Jan 3 |
M84AE |
M13 |
Distillation,
Operation and
Design |
5 Days |
7,000 |
Dammam |
| May 3 |
M84AE |
M13 |
Distillation,
Operation and
Design |
5 Days |
9,000 |
Abu Dhabi |
| Oct 10 |
M84AE |
M13 |
Distillation,
Operation and
Design |
5 Days |
7,000 |
Dammam |
| Jan 31 |
M58A |
M14 |
Diesel
Engine Components,
Operation and Overhauling |
5 Days |
7,000 |
Dammam |
| Jun 13 |
M58A |
M14 |
Diesel
Engine Components,
Operation and Overhauling |
5 Days |
8,000 |
Riyadh |
| Dec 26 |
M58A |
M14 |
Diesel
Engine Components,
Operation and Overhauling |
5 Days |
7,000 |
Dammam |
| Mar 7 |
M92A |
M14 |
Diesel
Engine Maintenance
and Defects |
5 Days |
7,000 |
Dammam |
| Aug 8 |
M92A |
M14 |
Diesel
Engine Maintenance
and Defects |
5 Days |
8,000 |
Abha |
| Nov 21 |
M92A |
M14 |
Diesel
Engine Maintenance
and Defects |
5 Days |
7,000 |
Dammam |
| Feb 21 |
M13A |
M15 |
Diesel
Engine Maintenance and Troubleshooting |
5 Days |
7,000 |
Dammam |
| Jul 19 |
M13A |
M15 |
Diesel
Engine Maintenance and Troubleshooting |
5 Days |
9,000 |
Oman |
| Dec 5 |
M13A |
M15 |
Diesel
Engine Maintenance and Troubleshooting |
5 Days |
7,000 |
Dammam |
| Jan 3 |
M4A |
M15 |
Drive
Components |
5 Days |
7,000 |
Dammam |
| Jun 20 |
M4A |
M15 |
Drive
Components |
5 Days |
8,000 |
Jubail |
| Nov 28 |
M4A |
M15 |
Drive
Components |
5 Days |
7,000 |
Dammam |
| Feb 28 |
M30B |
M16 |
Economical
Operation of Steam Turbines |
10 Days |
12,000 |
Dammam |
| Jun
27 |
M30B |
M16 |
Economical
Operation of Steam Turbines |
10 Days |
13,000 |
Riyadh |
| Sept 26 |
M30B |
M16 |
Economical
Operation of Steam Turbines |
10 Days |
12,000 |
Dammam |
| Jan 10 |
M35A |
M16 |
Fabrication
Techniques |
5 Days |
7,000 |
Dammam |
| May 9 |
M35A |
M16 |
Fabrication
Techniques |
5 Days |
8,000 |
Abha |
| Oct 17 |
M35A |
M16 |
Fabrication
Techniques |
5 Days |
7,000 |
Dammam |
| Mar 14 |
M33B |
M17 |
Flash
Evaporation Desalination Plant |
10 Days |
12,000 |
Dammam |
| Jul 25 |
M33B |
M17 |
Flash
Evaporation Desalination Plant |
10 Days |
13,000 |
Jubail |
| Dec 12 |
M33B |
M17 |
Flash
Evaporation Desalination Plant |
10 Days |
12,000 |
Dammam |
| Jan 17 |
M42AE |
M17 |
Fundamentals
of Gas Turbine Design and Operation |
5 Days |
7,000 |
Dammam |
| Apr 11 |
M42AE |
M17 |
Fundamentals
of Gas Turbine Design and Operation |
5 Days |
8,000 |
Riyadh |
| Aug 15 |
M42AE |
M17 |
Fundamentals
of Gas Turbine Design and Operation |
5 Days |
7,000 |
Dammam |
| Nov 15 |
M42AE |
M17 |
Fundamentals
of Gas Turbine Design and Operation |
5 Days |
9,000 |
Qatar |
| Mar 21 |
M65AE |
M18 |
Fundamentals
of Steam Turbine Design and Operation |
5 Days |
7,000 |
Dammam |
| Jul 4 |
M65AE |
M18 |
Fundamentals
of Steam Turbine Design and Operation |
5 Days |
8,000 |
Riyadh |
| Oct 24 |
M65AE |
M18 |
Fundamentals
of Steam Turbine Design and Operation |
5 Days |
7,000 |
Dammam |
| Feb 7 |
M94AE |
M18 |
Gas
Turbine Design |
5 Days |
7,000 |
Dammam |
| Jun 6 |
M94AE |
M18 |
Gas
Turbine Design |
5 Days |
8,000 |
Jubail |
| Dec 19 |
M94AE |
M18 |
Gas
Turbine Design |
5 Days |
7,000 |
Dammam |
| Jan 24 |
M50A |
M19 |
Gas
Turbine Maintenance and Overhauling |
5 Days |
7,000 |
Dammam |
| May 16 |
M50A |
M19 |
Gas
Turbine Maintenance and Overhauling |
5 Days |
8,000 |
Abha |
| Nov 21 |
M50A |
M19 |
Gas
Turbine Maintenance and Overhauling |
5 Days |
7,000 |
Dammam |
| Feb 14 |
M54A |
M19 |
Gas
Turbine Operation and Maintenance |
5 Days |
7,000 |
Dammam |
| Jun 7 |
M54A |
M19 |
Gas
Turbine Operation and Maintenance |
5 Days |
9,000 |
Cairo |
| Oct 31 |
M54A |
M19 |
Gas
Turbine Operation and Maintenance |
5 Days |
7,000 |
Dammam |
| Apr 18 |
M8B |
M20 |
Gas
Turbine Operation and Maintenance (Frames 5 & 7) |
10 Days |
12,000 |
Dammam |
| Sept 27 |
M8B |
M20 |
Gas
Turbine Operation and Maintenance (Frames 5 & 7) |
10 Days |
14,000 |
Dubai |
| Dec 26 |
M8B |
M20 |
Gas
Turbine Operation and Maintenance (Frames 5 & 7) |
10 Days |
12,000 |
Dammam |
| Mar 28 |
M55A |
M20 |
Gas
Turbine Operation Frame 7 |
5 Days |
7,000 |
Dammam |
| Aug 1 |
M55A |
M20 |
Gas
Turbine Operation Frame 7 |
5 Days |
8,000 |
Abha |
| Nov 28 |
M55A |
M20 |
Gas
Turbine Operation Frame 7 |
5 Days |
7,000 |
Dammam |
| Jan 31 |
M27B |
M21 |
Gas
Turbine
Operations,
Maintenance and Protection |
10 Days |
12,000 |
Dammam |
| Jul 11 |
M27B |
M21 |
Gas
Turbine
Operations,
Maintenance and Protection |
10 Days |
12,000 |
Dammam |
| Dec 5 |
M27B |
M21 |
Gas
Turbine
Operations,
Maintenance and Protection |
10 Days |
13,000 |
Riyadh |
| Feb 21 |
M5A |
M21 |
Gear
Reducers |
5 Days |
7,000 |
Dammam |
| Jun 13 |
M5A |
M21 |
Gear
Reducers |
5 Days |
7,000 |
Dammam |
| Oct 3 |
M5A |
M21 |
Gear
Reducers |
5 Days |
8,000 |
Jubail |
| Mar 7 |
M36A |
M22 |
General
Safety |
5 Days |
7,000 |
Dammam |
| Aug 8 |
M36A |
M22 |
General
Safety |
5 Days |
8,000 |
Abha |
| Dec 12 |
M36A |
M22 |
General
Safety |
5 Days |
7,000 |
Dammam |
| Jan 10 |
M93AE |
M22 |
Heat
Exchangers |
5 Days |
8,000 |
Jubail |
| May 23 |
M93AE |
M22 |
Heat
Exchangers |
5 Days |
7,000 |
Dammam |
| Nov 14 |
M93AE |
M22 |
Heat
Exchangers |
5 Days |
7,000 |
Dammam |
| Jan 17 |
M37A |
M23 |
Heat
Exchangers, Design,
Performance and Operation |
5 Days |
8,000 |
Abha |
| May 30 |
M37A |
M23 |
Heat
Exchangers, Design,
Performance and Operation |
5 Days |
7,000 |
Dammam |
| Sept 27 |
M37A |
M23 |
Heat
Exchangers, Design,
Performance and Operation |
5 Days |
9,000 |
Cairo |
| Dec 19 |
M37A |
M23 |
Heat
Exchangers, Design,
Performance and Operation |
5 Days |
7,000 |
Dammam |
| Feb 28 |
M102A |
M23 |
Heavy
Duty Gas Turbines |
5 Days |
7,000 |
Dammam |
| Jun 20 |
M102A |
M23 |
Heavy
Duty Gas Turbines |
5 Days |
8,000 |
Jubail |
| Oct 17 |
M102A |
M23 |
Heavy
Duty Gas Turbines |
5 Days |
7,000 |
Dammam |
| Jan 3 |
M10A |
M24 |
Heat
Exchangers |
5 Days |
7,000 |
Dammam |
| Jul 18 |
M10A |
M24 |
Heat
Exchangers |
5 Days |
8,000 |
Abha |
| Oct 10 |
M10A |
M24 |
Heat
Exchangers |
5 Days |
7,000 |
Dammam |
| Apr 25 |
M89A |
M24 |
HVAC |
5 Days |
7,000 |
Dammam |
| Sept 26 |
M89A |
M24 |
HVAC |
5 Days |
8,000 |
Riyadh |
| Dec 26 |
M89A |
M24 |
HVAC |
5 Days |
7,000 |
Dammam |
| Feb 28 |
M90A |
M25 |
HVAC
System
Controls |
5 Days |
7,000 |
Dammam |
| Jul 25 |
M90A |
M25 |
HVAC
System
Controls |
5 Days |
7,000 |
Dammam |
| Mar 14 |
M91A |
M25 |
Hydraulic
Control Systems, Defects and Maintenance |
5 Days |
7,000 |
Dammam |
| Aug 16 |
M91A |
M25 |
Hydraulic
Control Systems, Defects and Maintenance |
5 Days |
9,000 |
Oman |
| Dec 19 |
M91A |
M25 |
Hydraulic
Control Systems, Defects and Maintenance |
5 Days |
7,000 |
Dammam |
| Jan 10 |
M16B |
M26 |
Hydraulic
Systems
and Troubleshooting |
10 Days |
12,000 |
Dammam |
| Jun 20 |
M16B |
M26 |
Hydraulic
Systems and Troubleshooting |
10 Days |
13,000 |
Jubail |
| Nov 21 |
M16B |
M26 |
Hydraulic
Systems and Troubleshooting |
10 Days |
12,000 |
Dammam |
| Jan 17 |
M40A |
M26 |
Introduction
to Frame 5001 Gas Turbine |
5 Days |
7,000 |
Dammam |
| Apr 4 |
M40A |
M26 |
Introduction
to Frame 5001 Gas Turbine |
5 Days |
8,000 |
Riyadh |
| Oct 17 |
M40A |
M26 |
Introduction
to Frame 5001 Gas Turbine |
5 Days |
7,000 |
Dammam |
| Jan 10 |
M100A |
M27 |
Journal
Bearing Maintenance |
5 Days |
7,000 |
Dammam |
| May 30 |
M100A |
M27 |
Journal
Bearing Maintenance |
5 Days |
8,000 |
Abha |
| Dec 26 |
M100A |
M27 |
Journal
Bearing Maintenance |
5 Days |
7,000 |
Dammam |
| Apr 11 |
M15B |
M27 |
Lathe
Procedure |
10 Days |
12,000 |
Dammam |
| Sept 26 |
M15B |
M27 |
Lathe
Procedure |
10 Days |
12,000 |
Dammam |
| Dec 5 |
M15B |
M27 |
Lathe
Procedure |
10 Days |
13,000 |
Riyadh |
| Mar 21 |
M46A |
M28 |
Lubrication
Oil Analysis |
5 Days |
7,000 |
Dammam |
| Aug 1 |
M46A |
M28 |
Lubrication
Oil Analysis |
5 Days |
7,000 |
Dammam |
| Nov 28 |
M46A |
M28 |
Lubrication
Oil Analysis |
5 Days |
7,000 |
Dammam |
| Jan 17 |
M51A |
M28 |
Lubrication
Techniques |
5 Days |
7,000 |
Dammam |
| Jul 4 |
M51A |
M28 |
Lubrication
Techniques |
5 Days |
8,000 |
Jubail |
| Nov 28 |
M51A |
M28 |
Lubrication
Techniques |
5 Days |
7,000 |
Dammam |
| Feb 7 |
M56A |
M29 |
Lubrication
Techniques of Bearings, Steam Turbine, Air Compressors and Gear Failure |
5 Days |
7,000 |
Dammam |
| Jun 27 |
M56A |
M29 |
Lubrication
Techniques of Bearings, Steam Turbine, Air Compressors and Gear Failure |
5 Days |
8,000 |
Abha |
| Dec 5 |
M56A |
M29 |
Lubrication
Techniques of Bearings, Steam Turbine, Air Compressors and Gear Failure |
5 Days |
7,000 |
Dammam |
| Jan 24 |
M80A |
M29 |
Mechanical
Fault Analysis |
5 Days |
7,000 |
Dammam |
| May 2 |
M80A |
M29 |
Mechanical
Fault Analysis |
5 Days |
8,000 |
Riyadh |
| Nov 14 |
M80A |
M29 |
Mechanical
Fault Analysis |
5 Days |
7,000 |
Dammam |
| Apr 18 |
M69A |
M30 |
Machinery
Failure Analysis and Prevention |
5 Days |
7,000 |
Dammam |
| Jul 11 |
M69A |
M30 |
Machinery
Failure Analysis and Prevention |
5 Days |
8,000 |
Abha |
| Oct 24 |
M69A |
M30 |
Machinery
Failure Analysis and Prevention |
5 Days |
7,000 |
Dammam |
| Mar 7 |
M6A |
M30 |
Mechanical
Troubleshooting |
5 Days |
7,000 |
Dammam |
| Jun 6 |
M6A |
M30 |
Mechanical
Troubleshooting |
5 Days |
8,000 |
Riyadh |
| Sept 26 |
M6A |
M30 |
Mechanical
Troubleshooting |
5 Days |
7,000 |
Dammam |
| Jan 31 |
M34B |
M31 |
Mechanical
Troubleshooting for Pumps, Bearings and Lubrication |
10 Days |
12,000 |
Dammam |
| Apr 25 |
M34B |
M31 |
Mechanical
Troubleshooting for Pumps, Bearings and Lubrication |
10 Days |
13,000 |
Jubail |
| Sept 26 |
M34B |
M31 |
Mechanical
Troubleshooting for Pumps, Bearings and Lubrication |
10 Days |
12,000 |
Dammam |
| Dec 20 |
M34B |
M31 |
Mechanical
Troubleshooting for Pumps, Bearings and Lubrication |
10 Days |
14,000 |
Cairo |
| Feb 21 |
M17B |
M31 |
Milling
Procedure |
10 Days |
12,000 |
Dammam |
| May 9 |
M17B |
M31 |
Milling
Procedure |
10 Days |
12,000 |
Dammam |
| Nov 21 |
M17B |
M31 |
Milling
Procedure |
10 Days |
12,000 |
Dammam |
| Mar 28 |
M19A |
M32 |
Measuring
Tools |
5 Days |
7,000 |
Dammam |
| Aug 8 |
M19A |
M32 |
Measuring
Tools |
5 Days |
8,000 |
Jubail |
| Dec 12 |
M19A |
M32 |
Measuring
Tools |
5 Days |
7,000 |
Dammam |
| Mar 14 |
M44A |
M32 |
Non
Destructive Test on Welds |
5 Days |
7,000 |
Dammam |
| Jul 18 |
M44A |
M32 |
Non
Destructive Test on Welds |
5 Days |
8,000 |
Abha |
| Dec 26 |
M44A |
M32 |
Non
Destructive Test on Welds |
5 Days |
7,000 |
Dammam |
| Jan 3 |
M52A |
M33 |
Operation
and Maintenance of Heat Recovery Steam Generator |
5 Days |
7,000 |
Dammam |
| May 16 |
M52A |
M33 |
Operation
and Maintenance of Heat Recovery Steam Generator |
5 Days |
8,000 |
Riyadh |
| Oct 31 |
M52A |
M33 |
Operation
and Maintenance of Heat Recovery Steam Generator |
5 Days |
7,000 |
Dammam |
| Feb 21 |
M60AE |
M33 |
Performance
and Design of Air Gas Components and Maintenance of Compressors |
5 Days |
7,000 |
Dammam |
| Jun 13 |
M60AE |
M33 |
Performance
and Design of Air Gas Components and Maintenance of Compressors |
5 Days |
8,000 |
Jubail |
| Dec 26 |
M60AE |
M33 |
Performance
and Design of Air Gas Components and Maintenance of Compressors |
5 Days |
7,000 |
Dammam |
| Apr 4 |
M18A |
M34 |
Pipe
Fitting |
5 Days |
7,000 |
Dammam |
| Aug 15 |
M18A |
M34 |
Pipe
Fitting |
5 Days |
8,000 |
Abha |
| Nov 28 |
M18A |
M34 |
Pipe
Fitting |
5 Days |
7,000 |
Dammam |
| Mar 21 |
M45A |
M34 |
Piping
System |
5 Days |
7,000 |
Dammam |
| Jul 25 |
M45A |
M34 |
Piping
System |
5 Days |
8,000 |
Riyadh |
| Dec 5 |
M45A |
M34 |
Piping
System |
5 Days |
7,000 |
Dammam |
| Jan 10 |
M20B |
M35 |
Pneumatic
Systems and Troubleshooting |
10 Days |
12,000 |
Dammam |
| May 16 |
M20B |
M35 |
Pneumatic
Systems and Troubleshooting |
10 Days |
13,000 |
Jubail |
| Oct 3 |
M20B |
M35 |
Pneumatic
Systems and Troubleshooting |
10 Days |
12,000 |
Dammam |
| Feb 28 |
M99A |
M35 |
Power
Heavy Duty Gas Turbine |
5 Days |
7,000 |
Dammam |
| Jul 4 |
M99A |
M35 |
Power
Heavy Duty Gas Turbine |
5 Days |
8,000 |
Abha |
| Nov 14 |
M99A |
M35 |
Power
Heavy Duty Gas Turbine |
5 Days |
7,000 |
Dammam |
| Mar 7 |
M75A |
M36 |
Pump:
Maintenance, Selection and Operation |
5 Days |
7,000 |
Dammam |
| Aug 1 |
M75A |
M36 |
Pump:
Maintenance, Selection and Operation |
5 Days |
8,000 |
Riyadh |
| Nov 21 |
M75A |
M36 |
Pump:
Maintenance, Selection and Operation |
5 Days |
7,000 |
Dammam |
| Jan 17 |
M68A |
M36 |
Pumps
Maintenance and Mechanical Seals |
5 Days |
7,000 |
Dammam |
| May 23 |
M68A |
M36 |
Pumps
Maintenance and Mechanical Seals |
5 Days |
8,000 |
Jubail |
| Oct 17 |
M68A |
M36 |
Pumps
Maintenance and Mechanical Seals |
5 Days |
7,000 |
Dammam |
| Feb 7 |
M1B |
M37 |
Pump
Operation and Maintenance |
10 Days |
12,000 |
Dammam |
| Jul 4 |
M1B |
M37 |
Pump
Operation and Maintenance |
10 Days |
13,000 |
Abha |
| Oct 17 |
M1B |
M37 |
Pump
Operation and Maintenance |
10 Days |
12,000 |
Dammam |
| Dec 12 |
M1B |
M37 |
Pump
Operation and Maintenance |
10 Days |
13,000 |
Jubail |
| Apr 11 |
M61AE |
M37 |
Pump
Technology Performance, Operation and Maintenance |
5 Days |
7,000 |
Dammam |
| Sept 26 |
M61AE |
M37 |
Pump
Technology Performance, Operation and Maintenance |
5 Days |
8,000 |
Riyadh |
| Dec 19 |
M61AE |
M37 |
Pump
Technology Performance, Operation and Maintenance |
5 Days |
7,000 |
Dammam |
| Mar 28 |
M74B |
M38 |
Predictive
Maintenance |
10 Days |
12,000 |
Dammam |
| Jun 21 |
M74B |
M38 |
Predictive
Maintenance |
10 Days |
14,000 |
Cairo |
| Oct 10 |
M74B |
M38 |
Predictive
Maintenance |
10 Days |
12,000 |
Dammam |
| Feb 14 |
M95A |
M38 |
Reading
of Mechanical Drawings |
5 Days |
7,000 |
Dammam |
| Jun 27 |
M95A |
M38 |
Reading
of Mechanical Drawings |
5 Days |
8,000 |
Jubail |
| Sept 26 |
M95A |
M38 |
Reading
of Mechanical Drawings |
5 Days |
7,000 |
Dammam |
| Jan 24 |
M88A |
M39 |
Refrigeration
and Air Conditioning Control |
5 Days |
7,000 |
Dammam |
| Jul 11 |
M88A |
M39 |
Refrigeration
and Air Conditioning Control |
5 Days |
8,000 |
Abha |
| Nov 28 |
M88A |
M39 |
Refrigeration
and Air Conditioning Control |
5 Days |
7,000 |
Dammam |
| Apr 18 |
M24A |
M39 |
Rigging |
5 Days |
7,000 |
Dammam |
| Jul 18 |
M24A |
M39 |
Rigging |
5 Days |
8,000 |
Riyadh |
| Dec 26 |
M24A |
M39 |
Rigging |
5 Days |
7,000 |
Dammam |
| Mar 14 |
M76A |
M40 |
Root
Cause Analysis |
5 Days |
7,000 |
Dammam |
| Aug 8 |
M76A |
M40 |
Root
Cause Analysis |
5 Days |
8,000 |
Abha |
| Dec 5 |
M76A |
M40 |
Root
Cause Analysis |
5 Days |
7,000 |
Dammam |
| Feb 21 |
M70A |
M40 |
Rotating
Equipment Troubleshooting |
5 Days |
7,000 |
Dammam |
| May 31 |
M70A |
M40 |
Rotating
Equipment Troubleshooting |
5 Days |
9,000 |
Oman |
| Oct 24 |
M70A |
M40 |
Rotating
Equipment Troubleshooting |
5 Days |
7,000 |
Dammam |
| Jan 31 |
M38A |
M41 |
Safe
Operation of Rigging and Heavy Mobile Equipment |
5 Days |
7,000 |
Dammam |
| Jun 6 |
M38A |
M41 |
Safe
Operation of Rigging and Heavy Mobile Equipment |
5 Days |
8,000 |
Jubail |
| Nov 28 |
M38A |
M41 |
Safe
Operation of Rigging and Heavy Mobile Equipment |
5 Days |
7,000 |
Dammam |
| Apr 25 |
M96A |
M41 |
Safety
and Relief Valves |
5 Days |
7,000 |
Dammam |
| Aug 15 |
M96A |
M41 |
Safety
and Relief Valves |
5 Days |
8,000 |
Jubail |
| Oct 31 |
M96A |
M41 |
Safety
and Relief Valves |
5 Days |
7,000 |
Dammam |
| Mar 21 |
M64A |
M42 |
Shaft
Alignment and Rotor Balancing |
5 Days |
7,000 |
Dammam |
| Jul 18 |
M64A |
M42 |
Shaft
Alignment and Rotor Balancing |
5 Days |
8,000 |
Riyadh |
| Dec 5 |
M64A |
M42 |
Shaft
Alignment and Rotor Balancing |
5 Days |
7,000 |
Dammam |
| Jan 3 |
M2B |
M42 |
Shaft
Alignment and Vibration Analysis |
10 Days |
12,000 |
Dammam |
| May 2 |
M2B |
M42 |
Shaft
Alignment and Vibration Analysis |
10 Days |
12,000 |
Dammam |
| Oct 3 |
M2B |
M42 |
Shaft
Alignment and Vibration Analysis |
10 Days |
12,000 |
Dammam |
| Jan 10 |
M53A |
M43 |
Steam
Turbine Maintenance and Overhauling |
5 Days |
7,000 |
Dammam |
| Aug 15 |
M53A |
M43 |
Steam
Turbine Maintenance and Overhauling |
5 Days |
8,000 |
Riyadh |
| Dec 12 |
M53A |
M43 |
Steam
Turbine Maintenance and Overhauling |
5 Days |
7,000 |
Dammam |
| Feb 28 |
M32A |
M44 |
Steam
Turbine Efficiency |
5 Days |
7,000 |
Dammam |
| Jun 6 |
M32A |
M44 |
Steam
Turbine Efficiency |
5 Days |
8,000 |
Riyadh |
| Sept 26 |
M32A |
M44 |
Steam
Turbine Efficiency |
5 Days |
7,000 |
Dammam |
| Apr 4 |
M47A |
M44 |
Steam
Turbine Operation and Protection |
5 Days |
7,000 |
Dammam |
| Aug 1 |
M47A |
M44 |
Steam
Turbine Operation and Protection |
5 Days |
8,000 |
Jubail |
| Dec 19 |
M47A |
M44 |
Steam
Turbine Operation and Protection |
5 Days |
7,000 |
Dammam |
| Jan 17 |
M21A |
M45 |
Steam
Turbine Part I |
5 Days |
7,000 |
Dammam |
| May 9 |
M21A |
M45 |
Steam
Turbine Part I |
5 Days |
8,000 |
Abha |
| Oct 10 |
M21A |
M45 |
Steam
Turbine Part I |
5 Days |
7,000 |
Dammam |
| Jan 24 |
M22A |
M45 |
Steam
Turbine Part II |
5 Days |
7,000 |
Dammam |
| May 16 |
M22A |
M45 |
Steam
Turbine Part II |
5 Days |
8,000 |
Riyadh |
| Oct 17 |
M22A |
M45 |
Steam
Turbine Part II |
5 Days |
7,000 |
Dammam |
| Mar 28 |
M82A |
M46 |
Tig
Welding |
5 Days |
7,000 |
Dammam |
| Jul 25 |
M82A |
M46 |
Tig
Welding |
5 Days |
7,000 |
Dammam |
| Nov 14 |
M82A |
M46 |
Tig
Welding |
5 Days |
7,000 |
Dammam |
| Feb 7 |
M67AE |
M46 |
Troubleshooting
Turbine Steam Path Damages |
5 Days |
7,000 |
Dammam |
| Jun 13 |
M67AE |
M46 |
Troubleshooting
Turbine Steam Path Damages |
5 Days |
8,000 |
Riyadh |
| Dec 26 |
M67AE |
M46 |
Troubleshooting
Turbine Steam Path Damages |
5 Days |
7,000 |
Dammam |
| Mar 7 |
M26A |
M47 |
Valve
Operation and Maintenance |
5 Days |
7,000 |
Dammam |
| Jun 20 |
M26A |
M47 |
Valve
Operation and Maintenance |
5 Days |
8,000 |
Jubail |
| Sept 26 |
M26A |
M47 |
Valve
Operation and Maintenance |
5 Days |
7,000 |
Dammam |
| Dec 6 |
M26A |
M47 |
Valve
Operation and Maintenance |
5 Days |
9,000 |
Qatar |
| Jan 31 |
M78A |
M47 |
Valve
Technology Specification, Operation and Maintenance |
5 Days |
7,000 |
Dammam |
| Jul 4 |
M78A |
M47 |
Valve
Technology Specification, Operation and Maintenance |
5 Days |
8,000 |
Riyadh |
| Nov 21 |
M78A |
M47 |
Valve
Technology Specification, Operation and Maintenance |
5 Days |
7,000 |
Dammam |
| Apr 11 |
M77AE |
M48 |
Vibration
Analysis: Implementing Latest Standard Systems and Procedures |
5 Days |
7,000 |
Dammam |
| Aug 8 |
M77AE |
M48 |
Vibration
Analysis: Implementing Latest Standard Systems and Procedures |
5 Days |
8,000 |
Abha |
| Dec 12 |
M77AE |
M48 |
Vibration
Analysis: Implementing Latest Standard Systems and Procedures |
5 Days |
7,000 |
Dammam |
| Jan 3 |
M85A |
M48 |
Water
Chemistry and Treatment |
5 Days |
7,000 |
Dammam |
| May 23 |
M85A |
M48 |
Water
Chemistry and Treatment |
5 Days |
8,000 |
Jubail |
| Oct 31 |
M85A |
M48 |
Water
Chemistry and Treatment |
5 Days |
7,000 |
Dammam |
| Feb 21 |
M25A |
M49 |
Water
Treatment |
5 Days |
7,000 |
Dammam |
| Jul 18 |
M25A |
M49 |
Water
Treatment |
5 Days |
8,000 |
Riyadh |
| Dec 19 |
M25A |
M49 |
Water
Treatment |
5 Days |
7,000 |
Dammam |
| Feb 14 |
M83A |
M49 |
Waste
Water Treatment |
5 Days |
7,000 |
Dammam |
| Jun 27 |
M83A |
M49 |
Waste
Water Treatment |
5 Days |
8,000 |
Abha |
| Oct 24 |
M83A |
M49 |
Waste
Water Treatment |
5 Days |
7,000 |
Dammam |
| Mar 14 |
M43A |
M50 |
Water
Analysis System |
5 Days |
7,000 |
Dammam |
| Jul 12 |
M43A |
M50 |
Water
Analysis System |
5 Days |
9,000 |
Cairo |
| Nov 28 |
M43A |
M50 |
Water
Analysis System |
5 Days |
7,000 |
Dammam |
| Apr 18 |
M81A |
M50 |
Welding
Inspection Technology |
5 Days |
7,000 |
Dammam |
| Aug 15 |
M81A |
M50 |
Welding
Inspection Technology |
5 Days |
7,000 |
Dammam |
| Nov 14 |
M81A |
M50 |
Welding
Inspection Technology |
5 Days |
7,000 |
Dammam |
| Jan 10 |
M3B |
M51 |
Welding
Practice, Gas and Arc |
10 Days |
12,000 |
Dammam |
| May 30 |
M3B |
M51 |
Welding
Practice, Gas and Arc |
10 Days |
13,000 |
Jubail |
| Oct 3 |
M3B |
M51 |
Welding
Practice, Gas and Arc |
10 Days |
12,000 |
Dammam |
| Mar 21 |
M28A |
M51 |
Welding
Technology |
5 Days |
7,000 |
Dammam |
| Jul 18 |
M28A |
M51 |
Welding
Technology |
5 Days |
8,000 |
Riyadh |
| Oct 10 |
M28A |
M51 |
Welding
Technology |
5 Days |
7,000 |
Dammam |
| Dec 27 |
M28A |
M51 |
Welding
Technology |
5 Days |
9,000 |
Oman |
|
|
|
|
|
|
|
|