| Date |
Code |
Page# |
Tilte |
Days |
Course
Fees |
Venue |
| Jan 3 |
E72A |
E1 |
AC
Electrical Motors and Drives |
5 Days |
7,000 |
Dammam |
| Jun 6 |
E72A |
E1 |
AC
Electrical Motors and Drives |
5 Days |
7,000 |
Dammam |
| Nov 14 |
E72A |
E1 |
AC
Electrical Motors and Drives |
5 Days |
8,000 |
Riyadh |
| May 9 |
E25A |
E1 |
AC/DC
Theory |
5 Days |
7,000 |
Dammam |
| Aug 8 |
E25A |
E1 |
AC/DC
Theory |
5 Days |
8,000 |
Riyadh |
| Dec 5 |
E25A |
E1 |
AC/DC
Theory |
5 Days |
7,000 |
Dammam |
| Feb 7 |
E66AE |
E2 |
Advanced
Electrical Power Systems Voltage and Dynamic Security in Power
System Operation |
5 Days |
7,000 |
Dammam |
| May 2 |
E66AE |
E2 |
Advanced
Electrical Power Systems Voltage and Dynamic Security in Power
System Operation |
5 Days |
9,000 |
Oman |
| Oct 3 |
E66AE |
E2 |
Advanced
Electrical Power Systems Voltage and Dynamic Security in Power
System Operation |
5 Days |
8,000 |
Jubail |
| Dec 26 |
E66AE |
E2 |
Advanced
Electrical Power Systems Voltage and Dynamic Security in Power
System Operation |
5 Days |
7,000 |
Dammam |
| Jan 10 |
E39A |
E2 |
Advanced
HV and EHV Switchgear |
5 Days |
7,000 |
Dammam |
| Jun 13 |
E39A |
E2 |
Advanced
HV and EHV Switchgear |
5 Days |
8,000 |
Jubail |
| Nov 21 |
E39A |
E2 |
Advanced
HV and EHV Switchgear |
5 Days |
7,000 |
Dammam |
| Jan 17 |
E69AE |
E3 |
Advanced
Protective Relays |
5 Days |
7,000 |
Dammam |
| Aug 1 |
E69AE |
E3 |
Advanced
Protective Relays |
5 Days |
7,000 |
Dammam |
| Dec 19 |
E69AE |
E3 |
Advanced
Protective Relays |
5 Days |
8,000 |
Riyadh |
| Mar 7 |
E109A |
E3 |
Advanced
Protective Relay Maintenance |
5 Days |
7,000 |
Dammam |
| Jul 4 |
E109A |
E3 |
Advanced
Protective Relay Maintenance |
5 Days |
7,000 |
Dammam |
| Dec 12 |
E109A |
E3 |
Advanced
Protective Relay Maintenance |
5 Days |
7,000 |
Dammam |
| Mar 14 |
E84AE |
E4 |
Automatic
Voltage Regulator |
5 Days |
7,000 |
Dammam |
| Jul 11 |
E84AE |
E4 |
Automatic
Voltage Regulator |
5 Days |
7,000 |
Dammam |
| Oct 24 |
E84AE |
E4 |
Automatic
Voltage Regulator |
5 Days |
8,000 |
Abha |
| Apr 11 |
E24A |
E4 |
Basic
Electricity |
5 Days |
7,000 |
Dammam |
| Aug 1 |
E24A |
E4 |
Basic
Electricity |
5 Days |
8,000 |
Jubail |
| Dec 26 |
E24A |
E4 |
Basic
Electricity |
5 Days |
7,000 |
Dammam |
| Mar 21 |
E85AE |
E5 |
Basic
Power System Generation |
5 Days |
7,000 |
Dammam |
| Jul 18 |
E85AE |
E5 |
Basic
Power System Generation |
5 Days |
8,000 |
Jubail |
| Oct 10 |
E85AE |
E5 |
Basic
Power System Generation |
5 Days |
7,000 |
Dammam |
| Dec 19 |
E85AE |
E5 |
Basic
Power System Generation |
5 Days |
9,000 |
Cairo |
| Mar 7 |
E120A |
E5 |
Batteries
Maintenance, Charger, and Batteries Car |
5 Days |
7,000 |
Dammam |
| Jun 25 |
E120A |
E5 |
Batteries
Maintenance, Charger, and Batteries Car |
5 Days |
8,000 |
Abha |
| Sept 26 |
E120A |
E5 |
Batteries
Maintenance, Charger, and Batteries Car |
5 Days |
7,000 |
Dammam |
| Feb 14 |
E127A |
E6 |
Building
Wiring Installation |
5 Days |
8,000 |
Riyadh |
| July 4 |
E127A |
E6 |
Building
Wiring Installation |
5 Days |
7,000 |
Dammam |
| Oct 21 |
E127A |
E6 |
Building
Wiring Installation |
5 Days |
7,000 |
Dammam |
| Mar 28 |
E83AE |
E6 |
Cable
Fault Location, Defects and Maintenance |
5 Days |
7,000 |
Dammam |
| Jun 20 |
E83AE |
E6 |
Cable
Fault Location, Defects and Maintenance |
5 Days |
8,000 |
Jubail |
| Sept 26 |
E83AE |
E6 |
Cable
Fault Location, Defects and Maintenance |
5 Days |
9,000 |
Dammam |
| Dec 27 |
E83AE |
E6 |
Cable
Fault Location, Defects and Maintenance |
5 Days |
7,000 |
Dubai |
| Jan 24 |
E106A |
E7 |
Cable
Testing and Fault Location |
5 Days |
7,000 |
Dammam |
| May 23 |
E106A |
E7 |
Cable
Testing and Fault Location |
5 Days |
8,000 |
Jubail |
| Oct 3 |
E106A |
E7 |
Cable
Testing and Fault Location |
5 Days |
7,000 |
Dammam |
| Feb 21 |
E129A |
E7 |
Circuit
Breakers Control Circuit |
5 Days |
7,000 |
Dammam |
| Jul 18 |
E129A |
E7 |
Circuit
Breakers Control Circuit |
5 Days |
8,000 |
Abha |
| Nov 28 |
E129A |
E7 |
Circuit
Breakers Control Circuit |
5 Days |
7,000 |
Dammam |
| Feb 21 |
E23B |
E8 |
Control
Circuits |
10 Days |
13,000 |
Jubail |
| Jun 27 |
E23B |
E8 |
Control
Circuits |
10 Days |
12,000 |
Dammam |
| Oct 31 |
E23B |
E8 |
Control
Circuits |
10 Days |
12,000 |
Dammam |
| Feb 28 |
E19A |
E8 |
Control
Equipment |
5 Days |
7,000 |
Dammam |
| Jul 25 |
E19A |
E8 |
Control
Equipment |
5 Days |
8,000 |
Riyadh |
| Nov 14 |
E19A |
E8 |
Control
Equipment |
5 Days |
7,000 |
Dammam |
| May 18 |
E50A |
E9 |
Commissioning
Testing and Start-Up of Electrical Systems |
5 Days |
7,000 |
Dammam |
| Aug 15 |
E50A |
E9 |
Commissioning
Testing and Start-Up of Electrical Systems |
5 Days |
7,000 |
Dammam |
| Nov 29 |
E50A |
E9 |
Commissioning
Testing and Start-Up of Electrical Systems |
5 Days |
9,000 |
Abu Dhabi |
| Jan 31 |
E64A |
E9 |
Corrosion
Control by Cathodic Protection |
5 Days |
8,000 |
Abha |
| May 16 |
E64A |
E9 |
Corrosion
Control by Cathodic Protection |
5 Days |
7,000 |
Dammam |
| Oct 10 |
E64A |
E9 |
Corrosion
Control by Cathodic Protection |
5 Days |
7,000 |
Dammam |
| Apr 25 |
E53A |
E10 |
Corrosion,
Erosion Engineering and Cathodic Protection |
5 Days |
7,000 |
Dammam |
| Aug 1 |
E53A |
E10 |
Corrosion,
Erosion Engineering and Cathodic Protection |
5 Days |
7,000 |
Dammam |
| Dec 13 |
E53A |
E10 |
Corrosion,
Erosion Engineering and Cathodic Protection |
5 Days |
9,000 |
Oman |
| Feb 7 |
E36AE |
E10 |
Data Base Creation for Power Systems |
5 Days |
7,000 |
Dammam |
| Jun 6 |
E36AE |
E10 |
Data
Base Creation for Power Systems |
5 Days |
8,000 |
Riyadh |
| Oct 31 |
E36AE |
E10 |
Data
Base Creation for Power Systems |
5 Days |
7,000 |
Dammam |
| Dec 27 |
E36AE |
E10 |
Data
Base Creation for Power Systems |
5 Days |
9,000 |
Cairo |
| Apr 4 |
E62AE |
E11 |
Data
Collection Monitoring |
5 Days |
7,000 |
Dammam |
| Jul 18 |
E62AE |
E11 |
Data
Collection Monitoring |
5 Days |
8,000 |
Jubail |
| Nov 21 |
E62AE |
E11 |
Data
Collection Monitoring |
5 Days |
7,000 |
Dammam |
| Dec 20 |
E62AE |
E11 |
Data
Collection Monitoring |
5 Days |
9,000 |
Qatar |
| Mar 7 |
E45AE |
E11 |
Digital
Exciter Maintenance |
5 Days |
7,000 |
Dammam |
| Sept 27 |
E45AE |
E11 |
Digital
Exciter Maintenance |
5 Days |
9,000 |
Qatar |
| Dec 26 |
E45AE |
E11 |
Digital
Exciter Maintenance |
5 Days |
7,000 |
Dammam |
| Mar 21 |
E56AE |
E12 |
Digital
Exciter EX2000 |
5 Days |
7,000 |
Dammam |
| Jul 26 |
E56AE |
E12 |
Digital
Exciter EX2000 |
5 Days |
9,000 |
Cairo |
| Dec 5 |
E56AE |
E12 |
Digital
Exciter EX2000 |
5 Days |
7,000 |
Dammam |
| Jan 3 |
E4B |
E12 |
Digital
& Numerical Relays |
10 Days |
12,000 |
Dammam |
| May 2 |
E4B |
E12 |
Digital
& Numerical Relays |
10 Days |
13,000 |
Jubail |
| Nov 14 |
E4B |
E12 |
Digital
& Numerical Relays |
10 Days |
12,000 |
Dammam |
| Jan 31 |
E113A |
E13 |
Digital
Protection Relays |
5 Days |
7,000 |
Dammam |
| May 30 |
E113A |
E13 |
Digital
Protection Relays |
5 Days |
8,000 |
Jubail |
| Nov 28 |
E113A |
E13 |
Digital
Protection Relays |
5 Days |
7,000 |
Dammam |
| Feb 14 |
E57AE |
E13 |
Digital
Techniques in Power Line |
5 Days |
8,000 |
Riyadh |
| Jun 6 |
E57AE |
E13 |
Digital
Techniques in Power Line |
5 Days |
7,000 |
Dammam |
| Oct 17 |
E57AE |
E13 |
Digital
Techniques in Power Line |
5 Days |
8,000 |
Dammam |
| Dec 13 |
E57AE |
E13 |
Digital
Techniques in Power Line |
5 Days |
9,000 |
Cairo |
| Jan 3 |
E119A |
E14 |
Distribution
Ring Main Unit (RMU) SF6 Gas and Ring Main Units (SF6)-Lucy Maintenance
and Inspection |
5 Days |
7,000 |
Dammam |
| Apr 18 |
E119A |
E14 |
Distribution
Ring Main Unit (RMU) SF6 Gas and Ring Main Units (SF6)-Lucy Maintenance
and Inspection |
5 Days |
8,000 |
Abha |
| Oct 10 |
E119A |
E14 |
Distribution
Ring Main Unit (RMU) SF6 Gas and Ring Main Units (SF6)-Lucy Maintenance
and Inspection |
5 Days |
7,000 |
Dammam |
| Jan 24 |
E125A |
E14 |
Distribution
Network Load |
5 Days |
7,000 |
Dammam |
| Apr 11 |
E125A |
E14 |
Distribution
Network Load |
5 Days |
8,000 |
Riyadh |
| Aug 1 |
E125A |
E14 |
Distribition
Network Load |
5 Days |
7,000 |
Dammam |
| Feb 7 |
E123A |
E15 |
Distribution
Transformers Maintenance and Inspections |
5 Days |
7,000 |
Dammam |
| May 9 |
E123A |
E15 |
Distribution
Transformers Maintenance and Inspections |
5 Days |
8,000 |
Jubail |
| Nov 14 |
E123A |
E15 |
Distribution
Transformers Maintenance and Inspections |
5 Days |
8,000 |
Jubail |
| Mar14 |
E117AE |
E15 |
Distribution
Voltage Regulators, Reclosers and Capacitor Bank |
5 Days |
7,000 |
Dammam |
| Jul 4 |
E117AE |
E15 |
Distribution
Voltage Regulators, Reclosers and Capacitor Bank |
5 Days |
7,000 |
Dammam |
| Dec 13 |
E117AE |
E15 |
Distribution
Voltage Regulators, Reclosers and Capacitor Bank |
5 Days |
9,000 |
Oman |
| Feb 7 |
E42A |
E16 |
Electro
technology |
5 Days |
7,000 |
Dammam |
| Jun 6 |
E42A |
E16 |
Electro
technology |
5 Days |
7,000 |
Dammam |
| Oct 24 |
E42A |
E16 |
Electro
technology |
5 Days |
8,000 |
Abha |
| Jan 10 |
E95AE |
E16 |
Electrical
Arc Furnace in Factory Steel, Operation, Maintenance and Troubleshooting |
5 Days |
7,000 |
Dammam |
| Apr 12 |
E95AE |
E16 |
Electrical
Arc Furnace in Factory Steel, Operation, Maintenance and Troubleshooting |
5 Days |
9,000 |
Qatar |
| Oct 3 |
E95AE |
E16 |
Electrical
Arc Furnace in Factory Steel, Operation, Maintenance and Troubleshooting |
5 Days |
7,000 |
Dammam |
| Mar 7 |
E87AE |
E17 |
Electrical
Distribution Design and Planning |
5 Days |
7,000 |
Dammam |
| Jun 27 |
E87AE |
E17 |
Electrical
Distribution Design and Planning |
5 Days |
7,000 |
Dammam |
| Oct 3 |
E87AE |
E17 |
Electrical
Distribution Design and Planning |
5 Days |
8,000 |
Jubail |
| Apr 4 |
E115AE |
E18 |
Electrical
Engineering for Non-Electrical Engineers |
5 Days |
7,000 |
Dammam |
| Aug 15 |
E115AE |
E18 |
Electrical
Engineering for Non-Electrical Engineers |
5 Days |
7,000 |
Riyadh |
| Dec 5 |
E115AE |
E18 |
Electrical
Engineering for Non-Electrical Engineers |
5 Days |
7,000 |
Dammam |
| Mar 14 |
E102AE |
E18 |
Electrical
Equipments, Testing and Maintenance |
5 Days |
8,000 |
Riyadh |
| Jul 4 |
E102AE |
E18 |
Electrical
Equipments, Testing and Maintenance |
5 Days |
7,000 |
Dammam |
| Oct 18 |
E102AE |
E18 |
Electrical
Equipments, Testing and Maintenance |
5 Days |
9,000 |
Abu Dhabi |
| Dec 26 |
E102AE |
E18 |
Electrical
Equipments, Testing and Maintenance |
5 Days |
7,000 |
Dammam |
| Jan 3 |
E1AE |
E19 |
Electrical
Faults, Causes, Detection and Remedies |
5 Days |
7,000 |
Dammam |
| Apr 18 |
E1AE |
E19 |
Electrical
Faults, Causes, Detection and Remedies |
5 Days |
8,000 |
Abha |
| Jul 11 |
E1AE |
E19 |
Electrical
Faults, Causes, Detection and Remedies |
5 Days |
7,000 |
Dammam |
| Nov 1 |
E1AE |
E19 |
Electrical
Faults, Causes, Detection and Remedies |
5 Days |
9,000 |
Qatar |
| Feb 14 |
E100AE |
E19 |
Electrical
Load Forecasting |
5 Days |
7,000 |
Dammam |
| Aug 8 |
E100AE |
E19 |
Electrical
Load Forecasting |
5 Days |
7,000 |
Dammam |
| Nov 14 |
E100AE |
E19 |
Electrical
Load Forecasting |
5 Days |
7,000 |
Dammam |
| Jan 17 |
E2B |
E20 |
Electrical
Maintenance and Troubleshooting |
10 Days |
12,000 |
Dammam |
| May 16 |
E2B |
E20 |
Electrical
Maintenance and Troubleshooting |
10 Days |
12,000 |
Dammam |
| Aug 1 |
E2B |
E20 |
Electrical
Maintenance and Troubleshooting |
10 Days |
13,000 |
Jubail |
| Dec 5 |
E2B |
E20 |
Electrical
Maintenance and Troubleshooting |
10 Days |
12,000 |
Dammam |
| Jan 24 |
E59A |
E20 |
Electrical
Measuring and Test Equipment |
5 Days |
7,000 |
Dammam |
| Jun 13 |
E59A |
E20 |
Electrical
Measuring and Test Equipment |
5 Days |
8,000 |
Riyadh |
| Sept 26 |
E59A |
E20 |
Electrical
Measuring and Test Equipment |
5 Days |
7,000 |
Dammam |
| Mar 28 |
E7A |
E21 |
Electrical
Print Reading |
5 Days |
7,000 |
Dammam |
| Jul 25 |
E7A |
E21 |
Electrical
Print Reading |
5 Days |
8,000 |
Riyadh |
| Oct 3 |
E7A |
E21 |
Electrical
Print Reading |
5 Days |
7,000 |
Dammam |
| Feb 28 |
E46AE |
E21 |
Electrical
Power Substation Maintenance |
5 Days |
7,000 |
Dammam |
| Jul 18 |
E46AE |
E21 |
Electrical
Power Substation Maintenance |
5 Days |
7,000 |
Dammam |
| Dec 20 |
E46AE |
E21 |
Electrical
Power Substation Maintenance |
5 Days |
9,000 |
Qatar |
| Jan 10 |
E70AE |
E22 |
Electrical
Troubleshooting Techniques |
5 Days |
7,000 |
Dammam |
| May 2 |
E70AE |
E22 |
Electrical
Troubleshooting Techniques |
5 Days |
7,000 |
Dammam |
| Sept 26 |
E70AE |
E22 |
Electrical
Troubleshooting Techniques |
5 Days |
8,000 |
Riyadh |
| May 9 |
E15A |
E22 |
Electrical
Wiring Theory and Basic Principles |
5 Days |
8,000 |
Abha |
| Aug 8 |
E15A |
E22 |
Electrical
Wiring Theory and Basic Principles |
5 Days |
7,000 |
Dammam |
| Nov 21 |
E15A |
E22 |
Electrical
Wiring Theory and Basic Principles |
5 Days |
7,000 |
Dammam |
| Feb 21 |
E96A |
E23 |
Electric Drive Speed Control and Maintenance |
5 Days |
7,000 |
Dammam |
| Jun 14 |
E96A |
E23 |
Electric
Drive Speed Control and Maintenance |
5 Days |
9,000 |
Qatar |
| Dec 12 |
E96A |
E23 |
Electric
Drive Speed Control and Maintenance |
5 Days |
7,000 |
Dammam |
| Feb 21 |
E118A |
E23 |
Energy
Meters Types Installation, Maintenance, Calibration and Troubleshooting |
5 Days |
8,000 |
Riyadh |
| May 23 |
E118A |
E23 |
Energy
Meters Types Installation, Maintenance, Calibration and Troubleshooting |
5 Days |
7,000 |
Dammam |
| Aug 15 |
E118A |
E23 |
Energy
Meters Types Installation, Maintenance, Calibration and Troubleshooting |
5 Days |
7,000 |
Dammam |
| Apr 25 |
E54AE |
E24 |
Fault
Analysis in Electrical Network |
5 Days |
7,000 |
Dammam |
| Aug 15 |
E54AE |
E24 |
Fault
Analysis in Electrical Network |
5 Days |
8,000 |
Jubail |
| Nov 28 |
E54AE |
E24 |
Fault
Analysis in Electrical Network |
5 Days |
7,000 |
Dammam |
| Feb 21 |
E22A |
E24 |
General
Troubleshooting and Protection |
5 Days |
7,000 |
Dammam |
| Jun 20 |
E22A |
E24 |
General
Troubleshooting and Protection |
5 Days |
7,000 |
Dammam |
| Sept 26 |
E22A |
E24 |
General
Troubleshooting and Protection |
5 Days |
8,000 |
Abha |
| Feb 28 |
E21A |
E25 |
Generator
and Electrical Systems |
5 Days |
7,000 |
Dammam |
| Jul 4 |
E21A |
E25 |
Generator
and Electrical Systems |
5 Days |
7,000 |
Dammam |
| Dec 5 |
E21A |
E25 |
Generator
and Electrical Systems |
5 Days |
7,000 |
Dammam |
| Jan 3 |
E79A |
E25 |
Generator
Circuit Breaker |
5 Days |
7,000 |
Dammam |
| May 23 |
E79A |
E25 |
Generator
Circuit Breaker |
5 Days |
8,000 |
Riyadh |
| Oct 17 |
E79A |
E25 |
Generator
Circuit Breaker |
5 Days |
7,000 |
Dammam |
| Mar 21 |
E47A |
E26 |
Generator
Maintenance |
5 Days |
7,000 |
Dammam |
| Jun 13 |
E47A |
E26 |
Generator
Maintenance |
5 Days |
7,000 |
Dammam |
| Oct 10 |
E47A |
E26 |
Generator
Maintenance |
5 Days |
7,000 |
Dammam |
| Feb 14 |
E30A |
E26 |
Generator
Protection |
5 Days |
7,000 |
Dammam |
| May 10 |
E30A |
E26 |
Generator
Protection |
5 Days |
9,000 |
Cairo |
| Aug 15 |
E30A |
E26 |
Generator
Protection |
5 Days |
8,000 |
Abha |
| Dec 26 |
E30A |
E26 |
Generator
Protection |
5 Days |
7,000 |
Dammam |
| Apr 11 |
E20A |
E27 |
Grounding
System |
5 Days |
7,000 |
Dammam |
| Aug 1 |
E20A |
E27 |
Grounding
System |
5 Days |
7,000 |
Dammam |
| Oct 31 |
E20A |
E27 |
Grounding
System |
5 Days |
7,000 |
Dammam |
| Mar 7 |
E94AE |
E27 |
Generation
and Transmission System Management |
5 Days |
7,000 |
Dammam |
| Jul 11 |
E94AE |
E27 |
Generation
and Transmission System Management |
5 Days |
7,000 |
Dammam |
| Oct 10 |
E94AE |
E27 |
Generation
and Transmission System Management |
5 Days |
8,000 |
Jubail |
| Apr 8 |
E9A |
E28 |
Hazard
Area Classifications |
5 Days |
8,000 |
Abha |
| Jul 18 |
E9A |
E28 |
Hazard
Area Classifications |
5 Days |
7,000 |
Dammam |
| Nov 28 |
E9A |
E28 |
Hazard
Area Classifications |
5 Days |
7,000 |
Dammam |
| May 16 |
E55AE |
E28 |
Hazard
Operability Studies (HAZOP) |
5 Days |
7,000 |
Dammam |
| Aug 1 |
E55AE |
E28 |
Hazard
Operability Studies (HAZOP) |
5 Days |
8,000 |
Jubail |
| Dec 12 |
E55AE |
E28 |
Hazard
Operability Studies (HAZOP) |
5 Days |
7,000 |
Dammam |
| Jan 10 |
E35A |
E29 |
High
Voltage Bus Bar Protection |
5 Days |
7,000 |
Dammam |
| Apr 18 |
E35A |
E29 |
High
Voltage Bus Bar Protection |
5 Days |
7,000 |
Dammam |
| Sept 26 |
E35A |
E29 |
High
Voltage Bus Bar Protection |
5 Days |
7,000 |
Dammam |
| Feb 14 |
E90A |
E29 |
High
Voltage Bus Bar Protection and Breaker Failure |
5 Days |
7,000 |
Dammam |
| May 2 |
E90A |
E29 |
High
Voltage Bus Bar Protection and Breaker Failure |
5 Days |
8,000 |
Riyadh |
| Oct 3 |
E90A |
E29 |
High
Voltage Bus Bar Protection and Breaker Failure |
5 Days |
7,000 |
Dammam |
| Mar 7 |
E17A |
E30 |
High
Voltage Electrical Safety |
5 Days |
7,000 |
Dammam |
| Jun 27 |
E17A |
E30 |
High Voltage
Electrical Safety |
5 Days |
7,000 |
Dammam |
| Oct 10 |
E17A |
E30 |
High Voltage
Electrical Safety |
5 Days |
7,000 |
Dammam |
| Mar 21 |
E128A |
E30 |
HRC
Fuse Applications, Isolators and Busbar Design |
5 Days |
7,000 |
Dammam |
| May 16 |
E128A |
E30 |
HRC
Fuse Applications, Isolators and Busbar Design |
5 Days |
8,000 |
Jubail |
| Aug 1 |
E128A |
E30 |
HRC
Fuse Applications, Isolators and Busbar Design |
5 Days |
7,000 |
Dammam |
| Jan 17 |
E86A |
E31 |
HV
AC, DC Breakers and Substation Equipment |
5 Days |
7,000 |
Dammam |
| Jul 25 |
E86A |
E31 |
HV
AC, DC Breakers and Substation Equipment |
5 Days |
7,000 |
Dammam |
| Nov 14 |
E86A |
E31 |
HV
AC, DC Breakers and Substation Equipment |
5 Days |
7,000 |
Dammam |
| Feb 21 |
E32A |
E31 |
Industrial
Electrical Safety |
5 Days |
8,000 |
Abha |
| May 9 |
E32A |
E31 |
Industrial
Electrical Safety |
5 Days |
7,000 |
Dammam |
| Aug 8 |
E32A |
E31 |
Industrial
Electrical Safety |
5 Days |
7,000 |
Dammam |
| Apr 25 |
E31A |
E32 |
Industrial
Motor Control |
5 Days |
7,000 |
Dammam |
| Aug 16 |
E31A |
E32 |
Industrial
Motor Control |
5 Days |
9,000 |
Oman |
| Dec 19 |
E31A |
E32 |
Industrial
Motor Control |
5 Days |
7,000 |
Dammam |
| Jan 31 |
E122AE |
E32 |
Industrial
Motor Control for Engineers |
5 Days |
7,000 |
Dammam |
| Apr 18 |
E122AE |
E32 |
Industrial
Motor Control for Engineers |
5 Days |
8,000 |
Riyadh |
| Aug 8 |
E122AE |
E32 |
Industrial
Motor Control for Engineers |
5 Days |
7,000 |
Dammam |
| Jan 24 |
E14B |
E33 |
Industrial
Switchgear, Troubleshooting, Maintenance and Testing |
10 Days |
12,000 |
Dammam |
| Apr 4 |
E14B |
E33 |
Industrial
Switchgear, Troubleshooting, Maintenance and Testing |
10 Days |
13,000 |
Jubail |
| Aug 1 |
E14B |
E33 |
Industrial
Switchgear, Troubleshooting, Maintenance and Testing |
10 Days |
12,000 |
Dammam |
| Nov 21 |
E14B |
E33 |
Industrial
Switchgear, Troubleshooting, Maintenance and Testing |
10 Days |
13,000 |
Riyadh |
| Mar 14 |
E28A |
E33 |
Instrument
Transformers and Energy Measurement |
5 Days |
7,000 |
Dammam |
| Jul 4 |
E28A |
E33 |
Instrument
Transformers and Energy Measurement |
5 Days |
8,000 |
Abha |
| Oct 17 |
E28A |
E33 |
Instrument
Transformers and Energy Measurement |
5 Days |
7,000 |
Dammam |
| Apr 11 |
E10A |
E34 |
Introduction
to Protective Relays |
5 Days |
7,000 |
Dammam |
| Aug 8 |
E10A |
E34 |
Introduction
to Protective Relays |
5 Days |
7,000 |
Dammam |
| Nov 28 |
E10A |
E34 |
Introduction
to Protective Relays |
5 Days |
7,000 |
Dammam |
| Feb 28 |
E37AE |
E34 |
Introduction
to Process Relays |
5 Days |
7,000 |
Dammam |
| Jun 6 |
E37AE |
E34 |
Introduction
to Process Relays |
5 Days |
8,000 |
Jubail |
| Dec 26 |
E37AE |
E34 |
Introduction
to Process Relays |
5 Days |
7,000 |
Dammam |
| May 23 |
E130A |
E35 |
Insulating
Oil Maintenance and Tests |
5 Days |
7,000 |
Dammam |
| Aug 15 |
E130A |
E35 |
Insulating
Oil Maintenance and Tests |
5 Days |
8,000 |
Abha |
| Nov 28 |
E130A |
E35 |
Insulating
Oil Maintenance and Tests |
5 Days |
7,000 |
Dammam |
| Jan 31 |
E76AE |
E35 |
Issues and Measures of Power Quality |
5 Days |
7,000 |
Dammam |
| May 16 |
E76AE |
E35 |
Issues and Measures of Power Quality |
5 Days |
9,000 |
Qatar |
| Sept 26 |
E76AE |
E35 |
Issues and Measures of Power Quality |
5 Days |
8,000 |
Dammam |
| Mar 21 |
E43A |
E36 |
Lightning Protection Systems |
5 Days |
7,000 |
Dammam |
| Jul 11 |
E43A |
E36 |
Lightning Protection Systems |
5 Days |
8,000 |
Riyadh |
| Dec 5 |
E43A |
E36 |
Lightning
Protection Systems |
5 Days |
7,000 |
Dammam |
| Feb 7 |
E61AE |
E36 |
Load
Frequency Control and Load Shedding |
5 Days |
7,000 |
Dammam |
| Jun 13 |
E61AE |
E36 |
Load Frequency
Control and Load Shedding |
5 Days |
7,000 |
Dammam |
| Oct 24 |
E61AE |
E36 |
Load
Frequency Control and Load Shedding |
5 Days |
7,000 |
Dammam |
| Apr 18 |
E92AE |
E37 |
Load
and Energy Management in Industrial Power Distribution Systems |
5 Days |
7,000 |
Dammam |
| Aug 15 |
E92AE |
E37 |
Load
and Energy Management in Industrial Power Distribution Systems |
5 Days |
8,000 |
Jubail |
| Nov 14 |
E92AE |
E37 |
Load
and Energy Management in Industrial Power Distribution Systems |
5 Days |
7,000 |
Dammam |
| Jan 3 |
E88A |
E37 |
Low
and Medium Voltage Switchgear |
5 Days |
7,000 |
Dammam |
| May 23 |
E88A |
E37 |
Low
and Medium Voltage Switchgear |
5 Days |
7,000 |
Dammam |
| Dec 12 |
E88A |
E37 |
Low
and Medium Voltage Switchgear |
5 Days |
7,000 |
Dammam |
| Mar 28 |
E89A |
E38 |
Low
Voltage Switchgear |
5 Days |
7,000 |
Dammam |
| Jul 18 |
E89A |
E38 |
Low
Voltage Switchgear |
5 Days |
7,000 |
Dammam |
| Nov 21 |
E89A |
E38 |
Low
Voltage Switchgear |
5 Days |
7,000 |
Dammam |
| Apr 4 |
E131A |
E38 |
LV
Circuit Fault Hunting and Troubleshooting |
5 Days |
8,000 |
Abha |
| Jul 4 |
E131A |
E38 |
LV
Circuit Fault Hunting and Troubleshooting |
5 Days |
7,000 |
Dammam |
| Oct 17 |
E131A |
E38 |
LV
Circuit Fault Hunting and Troubleshooting |
5 Days |
7,000 |
Dammam |
| Feb 14 |
E74A |
E39 |
Maintenance
of Meters and Breakers |
5 Days |
7,000 |
Dammam |
| Jun 20 |
E74A |
E39 |
Maintenance
of Meters and Breakers |
5 Days |
7,000 |
Dammam |
| Sept 26 |
E74A |
E39 |
Maintenance
of Meters and Breakers |
5 Days |
7,000 |
Dammam |
| Mar 7 |
E13A |
E39 |
Motor
Control Center and Starters |
5 Days |
7,000 |
Dammam |
| Aug 15 |
E13A |
E39 |
Motor
Control Center and Starters |
5 Days |
7,000 |
Dammam |
| Dec 19 |
E13A |
E39 |
Motor
Control Center and Starters |
5 Days |
7,000 |
Dammam |
| Mar 14 |
E3A |
E40 |
Motor
Testing and Maintenance |
5 Days |
7,000 |
Dammam |
| Jun 27 |
E3A |
E40 |
Motor
Testing and Maintenance |
5 Days |
8,000 |
Abha |
| Oct 3 |
E3A |
E40 |
Motor
Testing and Maintenance |
5 Days |
7,000 |
Dammam |
| Jan 17 |
E34A |
E40 |
Motor
Protection |
5 Days |
8,000 |
Jubail |
| Apr 25 |
E34A |
E40 |
Motor
Protection |
5 Days |
7,000 |
Dammam |
| Jul 25 |
E34A |
E40 |
Motor
Protection |
5 Days |
8,000 |
Riyadh |
| Nov 28 |
E34A |
E40 |
Motor
Protection |
5 Days |
7,000 |
Dammam |
| Jan 10 |
E97A |
E41 |
Modern
Controller Applications in Power System |
5 Days |
7,000 |
Dammam |
| May 30 |
E97A |
E41 |
Modern
Controller Applications in Power System |
5 Days |
8,000 |
Abha |
| Oct 31 |
E97A |
E41 |
Modern
Controller Applications in Power System |
5 Days |
7,000 |
Dammam |
| Feb 21 |
E6B |
E41 |
Motors |
10 Days |
12,000 |
Dammam |
| May 2 |
E6B |
E41 |
Motors |
10 Days |
13,000 |
Jubail |
| Sept 26 |
E6B |
E41 |
Motors |
10 Days |
12,000 |
Dammam |
| Dec 26 |
E6B |
E41 |
Motors |
10 Days |
13,000 |
Abha |
| Mar 28 |
E124A |
E42 |
MV
Distribution Network Troubleshooting |
5 Days |
7,000 |
Dammam |
| Jun 20 |
E124A |
E42 |
MV
Distribution Network Troubleshooting |
5 Days |
7,000 |
Dammam |
| Nov 21 |
E124A |
E42 |
MV
Distribution Network Troubleshooting |
5 Days |
8,000 |
Abha |
| Jan 24 |
E112A |
E42 |
National
Electrical Codes Applications |
5 Days |
8,000 |
Jubail |
| Aug 4 |
E112A |
E42 |
National
Electrical Codes Applications |
5 Days |
7,000 |
Dammam |
| Apr 4 |
E48A |
E43 |
On
Load Tap Changer |
5 Days |
7,000 |
Dammam |
| Aug 1 |
E48A |
E43 |
On
Load Tap Changer |
5 Days |
7,000 |
Dammam |
| Nov 14 |
E48A |
E43 |
On
Load Tap Changer |
5 Days |
7,000 |
Dammam |
| May 9 |
E58A |
E43 |
Operation
and Maintenance of Distribution Network |
5 Days |
7,000 |
Dammam |
| Sept 26 |
E58A |
E43 |
Operation
and Maintenance of Distribution Network |
5 Days |
8,000 |
Jubail |
| Dec 5 |
E58A |
E43 |
Operation
and Maintenance of Distribution Network |
5 Days |
7,000 |
Dammam |
| Jan 31 |
E44A |
E44 |
Operation
and Maintenance of HV Equipment and Transformers |
5 Days |
8,000 |
Riyadh |
| Apr 11 |
E44A |
E44 |
Operation
and Maintenance of HV Equipment and Transformers |
5 Days |
7,000 |
Dammam |
| Aug 8 |
E44A |
E44 |
Operation
and Maintenance of HV Equipment and Transformers |
5 Days |
7,000 |
Dammam |
| Feb 28 |
E81A |
E44 |
Operation,
Maintenance and Protection of Power Transformers |
5 Days |
7,000 |
Dammam |
| Jun 14 |
E81A |
E44 |
Operation,
Maintenance and Protection of Power Transformers |
5 Days |
9,000 |
Cairo |
| Nov 21 |
E81A |
E44 |
Operation,
Maintenance and Protection of Power Transformers |
5 Days |
7,000 |
Dammam |
| Mar 21 |
E80A |
E45 |
Operating
Switchgear of Sub-Station and Distribution |
5 Days |
7,000 |
Dammam |
| Jun 6 |
E80A |
E45 |
Operating
Switchgear of Sub-Station and Distribution |
5 Days |
8,000 |
Jubail |
| Oct 10 |
E80A |
E45 |
Operating
Switchgear of Sub-Station and Distribution |
5 Days |
7,000 |
Dammam |
| Jan 10 |
E93AE |
E45 |
Power
Distribution System Grounding and Transients |
5 Days |
7,000 |
Dammam |
| May 16 |
E93AE |
E45 |
Power
Distribution System Grounding and Transients |
5 Days |
7,000 |
Dammam |
| Sept 26 |
E93AE |
E45 |
Power
Distribution System Grounding and Transients |
5 Days |
8,000 |
Abha |
| Feb 14 |
E103AE |
E46 |
Power
Flow Analysis |
5 Days |
7,000 |
Dammam |
| May 23 |
E103AE |
E46 |
Power
Flow Analysis |
5 Days |
8,000 |
Riyadh |
| Aug 1 |
E103AE |
E46 |
Power
Flow Analysis |
5 Days |
7,000 |
Dammam |
| Dec 19 |
E103AE |
E46 |
Power
Flow Analysis |
5 Days |
8,000 |
Abha |
| Jan 17 |
E71AE |
E46 |
Power
System Harmonics |
5 Days |
7,000 |
Dammam |
| May 30 |
E71AE |
E46 |
Power
System Harmonics |
5 Days |
7,000 |
Dammam |
| Nov 21 |
E71AE |
E46 |
Power
System Harmonics |
5 Days |
7,000 |
Dammam |
| Jan 31 |
E65A |
E47 |
Protection
and Alarm Systems |
5 Days |
7,000 |
Dammam |
| Jun 14 |
E65A |
E47 |
Protection
and Alarm Systems |
5 Days |
9,000 |
Oman |
| Dec 19 |
E65A |
E47 |
Protection
and Alarm Systems |
5 Days |
7,000 |
Dammam |
| Mar 14 |
E98AE |
E47 |
Power
System Network Distribution and Protection |
5 Days |
7,000 |
Dammam |
| Aug 8 |
E98AE |
E47 |
Power System Network Distribution and Protection |
5 Days |
8,000 |
Abha |
| Dec 5 |
E98AE |
E47 |
Power
System Network Distribution and Protection |
5 Days |
7,000 |
Dammam |
| Mar 28 |
E75AE |
E48 |
Power
Cable Characteristics and Application |
5 Days |
7,000 |
Dammam |
| Jul 11 |
E75AE |
E48 |
Power
Cable Characteristics and Application |
5 Days |
7,000 |
Dammam |
| Oct 17 |
E75AE |
E48 |
Power
Cable Characteristics and Application |
5 Days |
8,000 |
Riyadh |
| Apr 11 |
E52AE |
E48 |
Principles
of Failure Analysis |
5 Days |
7,000 |
Dammam |
| Jul 11 |
E52AE |
E48 |
Principles
of Failure Analysis |
5 Days |
8,000 |
Jubail |
| Oct 3 |
E52AE |
E48 |
Principles
of Failure Analysis |
5 Days |
8,000 |
Dammam |
| Apr 18 |
E99AE |
E49 |
Power
Factor Correction and Voltage Regulation Using Static-VAR Compensators |
5 Days |
8,000 |
Abha |
| Aug 15 |
E99AE |
E49 |
Power
Factor Correction and Voltage Regulation Using Static-VAR Compensators |
5 Days |
7,000 |
Dammam |
| Nov 28 |
E99AE |
E49 |
Power
Factor Correction and Voltage Regulation Using Static-VAR Compensators |
5 Days |
7,000 |
Dammam |
| Feb 21 |
E18AE |
E50 |
Power
System Grounding |
5 Days |
7,000 |
Dammam |
| May 30 |
E18AE |
E50 |
Power
System Grounding |
5 Days |
7,000 |
Dammam |
| Jul 25 |
E18AE |
E50 |
Power
System Grounding |
5 Days |
7,000 |
Dammam |
| Dec 27 |
E18AE |
E50 |
Power
System Grounding |
5 Days |
9,000 |
Abu Dhabi |
| Mar 28 |
E41AE |
E50 |
Power
System Restoration |
5 Days |
7,000 |
Dammam |
| Aug 8 |
E41AE |
E50 |
Power
System Restoration |
5 Days |
8,000 |
Riyadh |
| Oct 17 |
E41AE |
E50 |
Power
System Restoration |
5 Days |
7,000 |
Dammam |
| Jan 24 |
E38A |
E51 |
Power
System Protection |
5 Days |
7,000 |
Dammam |
| Jun 6 |
E38A |
E51 |
Power
System Protection |
5 Days |
7,000 |
Dammam |
| Nov 28 |
E38A |
E51 |
Power
System Protection |
5 Days |
7,000 |
Dammam |
| Feb 28 |
E51AE |
E51 |
Power
System Protection of Electrical Network |
5 Days |
7,000 |
Dammam |
| Jul 4 |
E51AE |
E51 |
Power
System Protection of Electrical Network |
5 Days |
8,000 |
Abha |
| Dec 12 |
E51AE |
E51 |
Power
System Protection of Electrical Network |
5 Days |
7,000 |
Dammam |
| Jan 10 |
E67AE |
E52 |
Power
System Analysis |
5 Days |
7,000 |
Dammam |
| Jun 27 |
E67AE |
E52 |
Power
System Analysis |
5 Days |
7,000 |
Dammam |
| Oct 31 |
E67AE |
E52 |
Power
System Analysis |
5 Days |
8,000 |
Riyadh |
| Apr 4 |
E26A |
E52 |
Power
System Operation |
5 Days |
7,000 |
Dammam |
| Sept 26 |
E26A |
E52 |
Power
System Operation |
5 Days |
7,000 |
Abha |
| Dec 12 |
E26A |
E52 |
Power
System Operation |
5 Days |
6,000 |
Dammam |
| Feb 7 |
E49AE |
E53 |
Power
Factor Correction |
5 Days |
7,000 |
Dammam |
| Jun 20 |
E49AE |
E53 |
Power
Factor Correction |
5 Days |
7,000 |
Dammam |
| Dec 12 |
E49AE |
E53 |
Power
Factor Correction |
5 Days |
7,000 |
Dammam |
| Jan 3 |
E63A |
E53 |
Power
Factor Testing |
5 Days |
7,000 |
Dammam |
| Apr 26 |
E63A |
E53 |
Power
Factor Testing |
5 Days |
9,000 |
Qatar |
| Jul 18 |
E63A |
E53 |
Power
Factor Testing |
5 Days |
7,000 |
Dammam |
| |
E103AE |
|
Power
Flow Analysis |
5 Days |
8,000 |
|
| Oct 24 |
E63A |
E53 |
Power
Factor Testing |
5 Days |
8,000 |
Riyadh |
| Mar 21 |
E8A |
E54 |
Preventive
Maintenance of Electrical Equipment |
5 Days |
7,000 |
Dammam |
| Aug 15 |
E8A |
E54 |
Preventive
Maintenance of Electrical Equipment |
5 Days |
8,000 |
Jubail |
| Nov 14 |
E8A |
E54 |
Preventive
Maintenance of Electrical Equipment |
5 Days |
7,000 |
Dammam |
| Feb 7 |
E27A |
E54 |
Protection
Fundamentals |
5 Days |
7,000 |
Dammam |
| May 2 |
E27A |
E54 |
Protection
Fundamentals |
5 Days |
7,000 |
Dammam |
| Nov 21 |
E27A |
E54 |
Protection
Fundamentals |
5 Days |
8,000 |
Abha |
| Mar 28 |
E16B |
E55 |
Protective
Relays |
10 Days |
12,000 |
Dammam |
| Jul 18 |
E16B |
E55 |
Protective
Relays |
10 Days |
13,000 |
Jubail |
| Oct 10 |
E16B |
E55 |
Protective
Relays |
10 Days |
12,000 |
Dammam |
| Jan 3 |
E11B |
E55 |
Protective
Relays, Principles and Application |
10 Days |
12,000 |
Dammam |
| Apr 18 |
E11B |
E555 |
Protective
Relays, Principles and Application |
10 Days |
12,000 |
Dammam |
| Sept 26 |
E11B |
E55 |
Protective
Relays, Principles and Application |
10 Days |
13,000 |
Riyadh |
| Feb 14 |
E68AE |
E56 |
Reactive
Power Management and Power Factor Correction |
5 Days |
8,000 |
Abha |
| Jun 20 |
E68AE |
E56 |
Reactive
Power Management and Power Factor Correction |
5 Days |
7,000 |
Dammam |
| Dec 26 |
E68AE |
E56 |
Reactive
Power Management and Power Factor Correction |
5 Days |
7,000 |
Dammam |
| Feb 21 |
E78B |
E56 |
Rewinding
of Electrical Motors |
10 Days |
12,000 |
Dammam |
| Jun 27 |
E78B |
E56 |
Rewinding
of Electrical Motors |
10 Days |
13,000 |
Jubail |
| Dec 5 |
E78B |
E56 |
Rewinding
of Electrical Motors |
10 Days |
12,000 |
Dammam |
| Jan 17 |
E91A |
E57 |
Rewinding
of Three Phase and Auto Transformer |
5 Days |
7,000 |
Dammam |
| Apr 25 |
E91A |
E57 |
Rewinding
of Three Phase and Auto Transformer |
5 Days |
7,000 |
Dammam |
| Aug 1 |
E91A |
E57 |
Rewinding
of Three Phase and Auto Transformer |
5 Days |
8,000 |
Abha |
| Jan 10 |
E111A |
E57 |
Reading
of Piping and Instrumentation |
5 Days |
7,000 |
Dammam |
| Jul 25 |
E111A |
E57 |
Reading
of Piping and Instrumentation |
5 Days |
8,000 |
Abha |
| Oct 17 |
E111A |
E57 |
Reading
of Piping and Instrumentation |
5 Days |
7,000 |
Dammam |
| Mar 7 |
E82AE |
E58 |
Safety
Measures During Work on De-Energising Overhead Lines |
5 Days |
7,000 |
Dammam |
| Jul 4 |
E82AE |
E58 |
Safety
Measures During Work on De-Energising Overhead Lines |
5 Days |
8,000 |
Riyadh |
| Nov 14 |
E82AE |
E58 |
Safety
Measures During Work on De-Energising Overhead Lines |
5 Days |
7,000 |
Dammam |
| Feb 28 |
E105A |
E58 |
SF6
Circuit Breaker |
5 Days |
7,000 |
Dammam |
| June 6 |
E105A |
E58 |
SF6
Circuit Breaker |
5 Days |
8,000 |
Jubail |
| Oct 24 |
E105A |
E58 |
SF6
Circuit Breaker |
5 Days |
7,000 |
Dammam |
| Jan 24 |
E108A |
E59 |
Short
Circuit Analysis |
5 Days |
7,000 |
Dammam |
| May 16 |
E108A |
E59 |
Short
Circuit Analysis |
5 Days |
7,000 |
Dammam |
| Dec 12 |
E108A |
E59 |
Short
Circuit Analysis |
5 Days |
7,000 |
Dammam |
| Mar 14 |
E101AE |
E59 |
Smart
Protection, Measuring and Control Devices |
5 Days |
7,000 |
Dammam |
| Aug 9 |
E101AE |
E59 |
Smart
Protection, Measuring and Control Devices |
5 Days |
9,000 |
Cairo |
| Nov 21 |
E101AE |
E59 |
Smart
Protection, Measuring and Control Devices |
5 Days |
7,000 |
Dammam |
| Feb 7 |
E77AE |
E60 |
Solutions
for Up-to-date Power Quality Problems |
5 Days |
8,000 |
Riyadh |
| Jul 11 |
E77AE |
E60 |
Solutions
for Up-to-date Power Quality Problems |
5 Days |
7,000 |
Dammam |
| Dec 19 |
E77AE |
E60 |
Solutions
for Up-to-date Power Quality Problems |
5 Days |
7,000 |
Dammam |
| Jan 31 |
E40A |
E60 |
Total
Motor Protection |
5 Days |
7,000 |
Dammam |
| Jun 13 |
E40A |
E60 |
Total
Motor Protection |
5 Days |
8,000 |
Jubail |
| Oct 31 |
E40A |
E60 |
Total
Motor Protection |
5 Days |
7,000 |
Dammam |
| Jan 10 |
E33A |
E61 |
Transmission
Line Protection |
5 Days |
7,000 |
Dammam |
| May 23 |
E33A |
E61 |
Transmission
Line Protection |
5 Days |
6,000 |
Dammam |
| Sept 26 |
E33A |
E61 |
Transmission
Line Protection |
5 Days |
8,000 |
Abha |
| Jan 3 |
E12B |
E61 |
Transformer
Principles and Application |
10 Days |
12,000 |
Dammam |
| Apr 4 |
E12B |
E61 |
Transformer
Principles and Application |
10 Days |
13,000 |
Riyadh |
| Oct 3 |
E12B |
E61 |
Transformer
Principles and Application |
10 Days |
12,000 |
Dammam |
| Jul 18 |
E29A |
E62 |
Transformer
Protection |
5 Days |
7,000 |
Dammam |
| Nov 28 |
E29A |
E62 |
Transformer
Protection |
5 Days |
8,000 |
Abha |
| Apr 11 |
E5A |
E62 |
Transformer
Testing and Maintenance |
5 Days |
7,000 |
Dammam |
| Jul 25 |
E5A |
E62 |
Transformer
Testing and Maintenance |
5 Days |
8,000 |
Jubail |
| Dec 26 |
E5A |
E62 |
Transformer
Testing and Maintenance |
5 Days |
7,000 |
Dammam |
| Feb 21 |
E121A |
E63 |
Transmission
Stations Equipment Maintenance and Inspection |
5 Days |
7,000 |
Dammam |
| May 23 |
E121A |
E63 |
Transmission
Stations Equipment Maintenance and Inspection |
5 Days |
8,000 |
Riyadh |
| Aug 8 |
E121A |
E63 |
Transmission
Stations Equipment Maintenance and Inspection |
5 Days |
7,000 |
Dammam |
| May 2 |
E126A |
E63 |
Transient
Over Voltages, Insulation Coordination and Neutral Earthing |
5 Days |
7,000 |
Dammam |
| Jul 11 |
E126A |
E63 |
Transient
Over Voltages, Insulation Coordination and Neutral Earthing |
5 Days |
8,000 |
Abha |
| Dec 19 |
E126A |
E63 |
Transient
Over Voltages, Insulation Coordination and Neutral Earthing |
5 Days |
7,000 |
Dammam |
| Jun 21 |
E73AE |
E64 |
Variable
Speed Motor Drives |
5 Days |
9,000 |
Oman |
| Oct 10 |
E73AE |
E64 |
Variable
Speed Motor Drives |
5 Days |
7,000 |
Dammam |
| Mar 28 |
E60AE |
E64 |
Voltage
Control Profiles |
5 Days |
7,000 |
Dammam |
| Jul 4 |
E60AE |
E64 |
Voltage
Control Profiles |
5 Days |
8,000 |
Jubail |
| Nov 14 |
E60AE |
E64 |
Voltage
Control Profiles |
5 Days |
7,000 |
Dammam |
| |
|
|
|
|
|
|
|